Requirements
Representatives
1.
Application for approval of fire prevention and fighting (original)
2.
Documents showing the ability of the designing firm
3.
Authenticated copy of IRC
if any
4.
Authenticated copies of land use right, house and land-attached asset ownership certificate
B. For specific application files
I. For planning projects application file, supplement:
1.
Drawings for fight prevention and fighting (original)
with ratio 1:500 and following Clause 1, 2, 3, 4 Article 12 of Decree 79/2014/ND-CP
2.
Cost estimation of total investment capital of project, building works
II. For conceptual design application file, supplement:
1.
Drawings for fight prevention and fighting (original)
showing conceptual design and following the Clause 1, 2, 3, 4, 5 and 6 Article 13 of Decree 79/2014/ND-CP
2.
Authenticated copy of IRC
3.
Cost estimation of total investment capital of project, building works
III. For approval of construction location application file, supplement:
1.
Drawings for fight prevention and fighting (original)
indicate clearly the location situation: wind direction, height of construction work, level of fire resistance, the information about the topography of the land, climate, hydrology, distance from the proposed construction works to other surrounding works.
2.
Authenticated copies of land use right, house and land-attached asset ownership certificate
or any documents that certify the land use right or construction work
IV. For construction drawings application file, supplement:
1.
Drawings for fight prevention and fighting (original)
following Clause 1, 2, 3, 4, 5 and 6 Article 13 of Decree No. 79/2014/ND-CP
2.
Authenticated copies of approval of master plan
3.
Cost estimation of total investment capital of project, building works
V. For approval of vehicles, supplement:
1.
Authenticated copy of IRC
2.
Drawings for fight prevention and fighting (original)
expressing solutions to ensure safety for fire prevention and fighting against nature activities and characteristics of dangerous fire and explosion of the vehicle; conditions to prevent fire spread fire protection, escape, rescue people in case of fire; measures to ensure the safety of fire prevention and fighting for power systems, fuel systems and engines; fire alarm system, fire fighting and other fire fighting vehicles; systems, detection equipment and troubleshooting of gas leaks, hazardous liquids and explosives.
3.
Cost estimation of total investment capital of vehicles
prepared by investors
VI. In case of authorization, supplement:
1.
Power of attorney (an authentic copy)
issued by investor for the authorized person in case investor is unable to come to submit application file
Time frame
a) For planning projects: Within 10 working days;
b) For basic designs: Within 10 working days for projects of Group A; within 5 working days for projects of Group B and Group C;
c) For construction location approval: Within 05 working days;
d) For construction drawing: Within 15 working days for projects and constructions of Group A; within 10 working days for projects and constructions of Group B and Group C;
The classification of projects and constructions to Group A, B, C shall be carried out under the Government’s provisions on construction investment project management in Annex 1, Decree 12/2009/NĐ-CP dated 10/02/2009.
Waiting time in queue:
Max. 5mn
Attention at counter:
Max. 15mn
Waiting time until next step:
Min. 5 days - Max. 15 days
Legal justification
1.
Law on fire prevention and fighting of National Assembly
Article 15
2.
Law no. 40/2013/QH13 of National Assembly, amending and supplementing few articles of the Law on fire prevention and fighting
Article 1
3.
Decree 79/2014/NĐ-CP of the Government guiding on implementation of the Law on fire prevention and fighting
articles 13, 15
4.
Circular 150/2014/TT-BTC of Ministry of Finance regulating collection and use of fees of approval of fire prevention and fighting
articles 4, 5
5.
Circular 66/2014/TT-BCA regulates implementation of few articles of Decree 79/2014/NĐ-CP which regulates implementation of the Law of fire prevention and frighting
Chapter 2 , Article 7
The article 5 of the Circular 150/2014/TT-BTC regulates when the payment should be made for each case of fire prevention and fighting approval