Meet Danang Industrial and Export Processing Zones Authority (DIEPZA)
Sign MOU on land lease  (1)
Obtain certified copies of foreign documents  (2)
Obtain consular legalized copies of documents  (2)
Obtain certified translation of documents  (2)
Obtain authenticated copies of documents  (1)
Obtain approval of environment impact assessment (EIA) report  (6)
Declare investment project information online
Obtain investment registration certificate (IRC)  (2)
Obtain authenticated copies of IRC  (1)
Obtain Enterprise Registration Certificate (ERC)  (3)
Make seal and notify seal specimen  (2)
21
Make seal
Open bank account  (1)
Obtain land lease contract and receive land plot on site  (2)
Obtain authenticated copies of signed land lease contract  (1)
Obtain construction planning certificate  (2)
Prepare construction drawing profile  (1)
Obtain authenticated copies of documents  (1)
Obtain land use right certificate  (2)
Obtain Infrastructure connection agreement  (2)
Obtain certificate of fire prevention and fighting approval  (3)
Obtain authenticated copies of documents  (1)
Obtain Master plan agreement and architectural construction solution  (2)

Preview & Print

Properties
 
29
Prepare construction drawing profile
(last modified: 1/21/2017)

Expected results

Drawings of Master plan x2 01 - Drawings of Master plan
Drawings of architectural design x2 01 - Drawings of architectural design
Drawings of technical infrastructure connection x6 01 - Drawings of technical infrastructure connection
CD disk containing soft copy of the drawings 01 - CD disk containing soft copy of the drawings
License of the designer 01 - License of the designer
Certificate of business registration of the design consulting firm 01 - Certificate of business registration of the design consulting firm

Costs

The cost is determined based on project's scale ( in terms of hectares or square metters) and is calculated according to Appendix - Section 1 of Circular 01/2013/TT-BXD

Time frame

Waiting time in queue: Max. 5mn
Attention at counter: Max. 20mn

Legal justification

1. Circular 16/2013/TT-BXD of Ministry of Construction amending Circular 06/2013/TT-BXD
Circular 16/2013/TT-BXD of Ministry of Construction amending Circular 06/2013/TT-BXD
Article 1