List of steps
(Total number of steps: 46)
Meet Danang Hi-Tech Park (DHTP)
Obtain certified copies of foreign documents  (2)
Obtain consular legalized copies of documents  (2)
Obtain certified translation of documents  (2)
Obtain authenticated copies of passports and/or Vietnamese ID cards  (1)
Obtain written approval of investment and introduction of project location  (4)
Obtain approval of environment impact assessment (EIA) report  (6)
Declare investment project information online
Obtain investment registration certificate (IRC)  (2)
Obtain authenticated copies of IRC  (1)
Obtain Enterprise Registration Certificate (ERC)  (3)
Make seal and notify seal specimen  (2)
24
Make seal
Open bank account  (1)
Obtain approval of land allocation or land lease and sign land lease contract  (3)
Obtain authenticated copy of documents  (1)
Obtain certificate of construction planning  (2)
Prepare construction drawing profile  (1)
Obtain approval of the detailed construction planning task  (2)
Obtain approval of the detailed construction plan and architectural plan of project  (2)
Obtain land use right certificate  (2)
Obtain certificate of fire prevention and fighting approval  (3)
Obtain approval of the conceptual plans of projects  (2)
Obtain construction permit  (2)

Preview & Print

Properties
 
33
Prepare construction drawing profile
(last modified: 8/21/2017)

Costs

( ver detalles )

Timeframe ( ver detalles )

Espera hasta paso siguiente

Free of charge
0 mn  -  0 mn
5 days  -  10 days

Contact details

Entity in charge

Any authorized construction design consulting firm

List of construction designing firms in Danang city List of construction designing firms in Danang city

Expected results

Detailed drawing of area, surveying coordinates with a scale of 1/500 x5 01 - Detailed drawing of area, surveying coordinates with a scale of 1/500
Explanations of the detailed construction planning Task of a 1/500 scale x5 01 - Explanations of the detailed construction planning Task of a 1/500 scale
Location map, area boundary x3 01 - Location map, area boundary
Drawings of the technical infrastructure plan x3 01 - Drawings of the technical infrastructure plan
Drawings of the architectural plan x3 01 - Drawings of the architectural plan
CD disk recording all data on explanations and relevant drawings 01 - CD disk recording all data on explanations and relevant drawings
Drawings for fight prevention and fighting x3 01 - Drawings for fight prevention and fighting
Cost estimation of total investment capital of project, building works x3 01 - Cost estimation of total investment capital of project, building works
Explanation and calculation of the preliminary construction design x3 01 - Explanation and calculation of the  preliminary construction design
Financial estimates of preliminary mass total investment x3 01 - Financial estimates of preliminary mass total investment
Investment project profile x3 01 - Investment project profile
Basic design profile x3 01 - Basic design profile
Acceptance reports on the construction survey and basic design dossier x3 01 - Acceptance reports on the construction survey and basic design dossier
Construction drawing profile 01 - Construction drawing profile
Drawings of technical infrastructure items x3 01 - Drawings of technical infrastructure items

Costs

Cost will be calculated depending on each specific project requirement

Time frame

Attention at counter: Max. 30mn
Waiting time until next step: Min. 5 days - Max. 10 days
Powered by eRegulations (c), a content management system developed by UNCTAD's Investment and Enterprise Division, Business Facilitation Program and licensed under Creative Commons License